SrNo.DepartmentStateWorking LocationTender No.
Tender Name
Work NameWork ModeLength (km)Tender ValueTender DateCorrigendum
Date Ext.
Remark
Start DateEnd Date
1NHAIBiharDarbhanga highwayNHAI/H /BH/Ramna ar-KacchiDar ah/NH119D/2024RFP for Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-
1 19D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from
Km 196+700 to Km 198+600), as part of the Amas-Darbhanga highway in the state of Bihar
on EPC mode.
EPC 2.6465.46 Cr.16-07-2407-10-204Yes 
2MoRTHJharkhand Giridih town of NH-114ARW/PIU/Dhanbad/Bid/03/2023-24onstruction of bypass around Giridih town of NH-114A to 2 lane with paved shoulder from Km 0.000 to km 23.835 (Design chainage) in the State of Jharkhand under EPC ModeEPC 23.7331.59 Cr.01-04-2423-09-24Yes 
3MoRTHJharkhandGiridih and Hazaribagh districts RW/Ranchi/AP-17/2022-23Widening and reconstruction of NH-522 (old NH-100) from Km 0 to Km 48 to 4-lane with paved shoulder under Giridih and Hazaribagh districts in the state of Jharkhand under EPC mode.EPC 48518.03 Cr.11-08-2323-09-24Yes 
4MoRTHJharkhandBero-Khunti section in the State of JharkhandRW/Ranchi/AP-07/2023-24Widening/Re-construction to two lane with paved shoulder of NH-143AG from km 37.400 (Design chainage) to Km 85.560 (Design Chainage) Bero-Khunti section in the State of Jharkhand on EPC Mode for the FY 2023-24EPC 48.16363.51 Cr.09-08-2421-10-24YesDoc. Not Availabe
7MoRTHUttar Pradesh(Sitapur to Kurain Section)CE-RO/LKO/NH 330D/2021-22/Civil Work dt.26.04.2023RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.EPC 38.85351.90 Cr.24-04-2310-10-24Yes 
8MoRTHJharkhandChaibasa Bypass (Putida village to Raghunathpur village) RW/Ranchi/AP-18/2022-23/JHRConstruction of 4 lane with Paved Shoulders Chaibasa Bypass (Putida village to Raghunathpur village) from Existing Km 136.644 to Existing Km 150.640 (Design Ch 0.000 to Design Ch18.045 ) section of NH-75E in the state of Jharkhand.EPC 18.045413.80 Cr.03-08-2423-09-24Yes 
10MoRTHBiharMangobandhar, Kendua, Tolesono, Jhajha, Narganjo and Bhairoganj Bypasses (Total Length-19.450km) 07-Construction of 6 no. of Mangobandhar, Kendua, Tolesono, Jhajha, Narganjo and Bhairoganj Bypasses (Total Length-19.450km) along with 2 no. of DLP free Sections (total length-21.821 Km) to two lane with paved shoulders standard in State of BiharEPC 19.45414.42 Cr.13-11-2308-10-24Yes 
11MoRTHBihar Bhagalpur Kharhara Village (Dhaka More) 2023_MoRTH_771865_1Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC modeEPC 36.6763.72 Cr.23-08-2308-10-24Yes 
12KrideBengloaurBenniganahalli to ChikkabanavaraK-RIDE/BSRP/C2/Track Laying/2024PACKAGE – C2: “Track Laying “Design, Supply, Installation, Testing and Commissioning of Ballastless, Ballasted Track, Fastening System and Turnouts in Corridor 2 from Benniganahalli to Chikkabanavara @ Chainage (-) 1413 to Chainage 27029 including Ballasted and Special Tracks in Soladevanahalli Depot”  102.00 Cr.12-08-2426-09-24No 
13MoRTHGoaZuari approaches to Start of Margao Bypass section 2024_MoRTH_819712_14-Laning from End of Zuari approaches to Start of Margao Bypass section of NH 66 from Km.536.800 to Km.543.450 on EPC Mode in the state of Goa under Annual Plan 2024-25.EPC  288.23 Cr.12-08-2425-09-24  
16PWDMizoramConstruction of Aizawl Bypass on Western Side2024_PWDRD_428_1Construction of Aizawl Bypass on Western SideEPC  475.63 Cr.16-08-2430-09-24  
17NHAIMeghalayaJowai-Ratacherra section of NH-6 in the state of Meghalaya  2024_NHAI_205360_1Slope stability and protection work of 7 nos. of vulnerable location along the Jowai-Ratacherra section of NH-6 in the state of Meghalaya on item rate (percentage) basisPB 76.19 Cr.19-0-202403-10-24  
18NHIDCLArunachal0.000 Km to 18.464 Km in the state of
Arunachal Pradesh
NHIDCL/Ar.Pr./NH-13/Bal. Work/D-B/2024Balance work for construction of 2-
Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch.
0.000 Km to 18.464 Km in the state of
Arunachal Pradesh on EPC Mode under
NH(O)-NE
EPC 18.465209.22 Cr.14-10-2415-10-24  
19MoRTHArunachalPKG-01 OF Sarli-Huri section of NH-913 (Frontier Highway)2024_MoRTH_824306_1Construction of road from km 0.000 to km 35.000 (Package-1) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 35358.11 Cr.05-09-2421-10-24  
20MoRTHArunachalPKG-07 OF Lada-Sarli section of NH-913 (Frontier Highway)2024_MoRTH_824334_1Construction of road from km 168.00 to km 183.400 (Package-7) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 15.4156.31 Cr.05-09-2421-10-24  
21MoRTHArunachalBile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway)2024_MoRTH_824332_1Construction of road from Km 0.000 to Km 17.812 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 17.812162.30 Cr.05-09-2421-10-24  
22MoRTHArunachalPKG-01 OF Bomdila-Nafra-Lada section of NH-913 (Frontier Highway)2024_MoRTH_824330_1Construction of road from km 19.554 to km 34.700 (Package-1) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 15.146246.94 Cr.05-09-2421-10-24  
23MoRTHArunachalPKG-04 OF Lada-Sarli section of NH-913 (Frontier Highway)2024_MoRTH_824325_1Construction of road from km 65.51 to km 85.60 (Package-4) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 20.09249.18 Cr.05-09-2421-10-24  
24MoRTHArunachalPKG-3 OF Taliha to Tato stretch of NH-913(Frontier Highway)2024_MoRTH_824260_1Construction of road from km 87.13 to Km 121.541 (package-3) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 34.411477.49 Cr.05-09-2421-10-24  
25MoRTHArunachalPKG-2 OF Sarli-Huri section of NH-913 (Frontier Highway)2024_MoRTH_824192_1Construction of road from km 35.000 to km 78.380 (Package-2) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 43.38528.81 Cr.05-09-2421-10-24  
26MoRTHArunachalBile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway)2024_MoRTH_824244_1Construction of road from Km 17.812 to Km 55.377 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 37.565512.78 Cr.05-09-2421-10-24  
27MoRTHArunachalPKG-05 OF  Lada-Sarli section of NH-913 (Frontier Highway)2024_MoRTH_824178_1Construction of road from km 85.60 to km 126.15 (Package-5) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 108.338558.57 Cr.05-09-2421-10-24  
28MoRTHArunachal PKG-03 OF Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) 2024_MoRTH_824115_1Construction of road from km 70.000 to km 113.000 (Package-3) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 43793.89 Cr.05-09-2421-10-24  
29MoRTHArunachalPKG-01 OF Lada-Sarli section of NH-913 (Frontier Highway) 2024_MoRTH_824323_1Construction of road from km 0.000 to km 16.820 (Package-1) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 16.82257.09 Cr.05-09-2421-10-24  
30MoRTHArunachal (Package-3) of Lada-Sarli section of NH-913 (Frontier Highway)  2024_MoRTH_824320_1Construction of road from km 43.65 to km 65.51 (Package-3) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 21.86283.05 Cr.05-09-2421-10-24  
31MoRTHArunachal(Package-2) of Huri-Taliha section of NH-913 (Frontier Highway)2024_MoRTH_824301_1Construction of road from km 28.50 to km 55.725 (Package-2) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 27.225422.48 Cr.05-09-2421-10-24  
32MoRTHArunachal(Package-2) of Lada-Sarli section of NH-913 (Frontier Highway)2024_MoRTH_824310_1Construction of road from km 16.820 to km 43.650 (Package-2) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 26.83337.22 Cr.05-09-2421-10-24  
33MoRTHArunachalfrom Km 0.000 to Km 27.430 of Bile to Migging stretch (Ch.0.0 at Bile) of NH-913(Frontier Highway)2024_MoRTH_824288_1Construction of road from Km 0.000 to Km 27.430 of Bile to Migging stretch (Ch.0.0 at Bile) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 27.43445.84 Cr.05-09-2421-10-24  
34MoRTHArunachal(Package-1) of Huri-Taliha section of NH-913 (Frontier Highway)2024_MoRTH_824273_1Construction of road from km 0.00 to km 28.50 (Package-1) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 28.5476.22 Cr.05-09-2421-10-24  
35MoRTHArunachal(Package-1) of Sarli-Huri section of NH-913 (Frontier Highway) 2024_MoRTH_824162_1Construction of road from km 34.700 to km 70.000 (Package-2) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal PradeshEPC 35564.95 Cr.05-09-2421-10-24  
37RailwayMizoramJiribam-Tupul (Imphal).CE/CON/JT/TN/2024/05Construction of permanent RCC lining in adits of tunnel No. 2, 4, 8 & 9
in between section VNGP to KBBP under jurisdiction of Dy.CE/CON/JRBM in connection
with construction of new BG Railway line from Jiribam-Tupul (Imphal)
  99.99 Cr.01-10-2415-10-24  
38NHIDCLMizoramNH 306 & 06 Section
Vairengte – Bilkhawthlir in the State of Mizoram in 
RO-Aizawl/Kolasib/STMC/V-S/NH-306&06/2024-25/1 Short Term Maintenance Contract (STMC) works
from Km 42 to Km 70 of NH 306 & 06 Section
Vairengte – Bilkhawthlir in the State of Mizoram in
FY-2024-25 
STMC2829.25 Cr.15-09-2426-09-24  